PV String Compatibility
Check temperature-adjusted voltage, MPPT window, current, DC/AC ratio and string-protection review conditions.
Open tool →
NEUTRON Solar Tools
Start with project inputs, calculate against a versioned method, then retain the evidence for sizing, BOS and engineering review.
14 connected tools · 1 retained project context
Tool workspace
Every result starts with valid inputs, explains its rule state and preserves the values used for the calculation.
Design01 / Design
Check temperature-adjusted voltage, MPPT window, current, DC/AC ratio and string-protection review conditions.
Open tool →
Design02 / Design
Find reference module classes and their safe string ranges for the entered inverter envelope.
Open tool →
Design03 / Design
Screen reference inverter classes through the same electrical checks before a final string recheck.
Open tool →
Design04 / Design
Separate hard electrical and form-factor exclusions from replacement candidates that need rechecking.
Open tool →
Design05 / Design
Model monthly and annual planning energy only from visible user-supplied irradiation and loss assumptions.
Open tool →
Sizing06 / Sizing
Calculate a specified conductor, then compare preliminary candidates before carrying values into the project.
Open tool →
Sizing07 / Sizing
Screen a preliminary copper or aluminum busbar section before thermal and short-circuit engineering verification.
Open tool →
Sizing08 / Sizing
Calculate occupied containment area from actual cable outside diameter and route geometry.
Open tool →
Sizing09 / Sizing
Build an editable preliminary material scope with quantity bases and engineering review gates.
Open tool →
Review10 / Review
Use buyer-entered planning values to create a transparent preliminary BOS estimate, never a price quotation.
Open tool →
Sizing11 / Sizing
Turn string count and environmental inputs into an explicit preliminary DC combiner requirement set.
Open tool →
Sizing12 / Sizing
Review preliminary fuse, SPD, voltage and earthing gates before a protection scope is saved.
Open tool →
Design13 / Design
Map PV, inverter, battery and AC/DC interfaces while keeping critical engineering review gates visible.
Open tool →
Review14 / Review
Combine local calculation snapshots, export the technical brief and send a traceable engineering RFQ.
Open tool →Project workspace
No project is stored yet. Add a valid result from either tool to create a browser-local project reference.
Methodology
Temperature coefficients, production tolerance, current headroom and cable assumptions remain visible beside the result.
Review methodologyStandards & compliance
Each calculation identifies the project-specific engineering and market confirmations that cannot be automated.
Review applicability