Map interfaces before material selection.

Map PV, inverter, battery and AC/DC interfaces before engineering review.

Live calculation · retained project context · engineer review

Hybrid System Configurator

Map the PV, inverter, battery and AC/DC interface boundaries before the project BOM is prepared for engineering review.

BlockedEngine 1.1.0
01 PV & inverter02 Battery scope03 Isolation concept04 Review package
Power architecture
Required scope boundaries

This calculator maps interfaces and review gates. It does not select a battery, inverter, grid-code setting or protection device on behalf of the engineer.