Build the project boundary before the equipment list.

Map application, voltage, capacity and interfaces into a reviewable preliminary architecture—then see what still needs data and what requires engineer confirmation.

Solar farm, battery energy storage and electrical substation at dusk
01

Inputs stay traceable

Known project information remains visible as the basis for every preliminary scope line.

02

Open gaps stay visible

Missing drawings, site conditions and boundaries cannot silently become a false result.

03

Engineer review stays explicit

The output is a technical conversation aid, not an approved construction design.

Turn an early project brief into a reviewable system boundary.

Set the known project basis, see the preliminary architecture and keep missing inputs visible. The builder is intentionally review-first: it does not approve ratings or manufacture a final design.

01 · Project inputs

Change a value to update the architecture output immediately.

Data required
Application and interface
Power basis
Required review boundaries

Preliminary screening only. Final equipment, protection coordination, standards applicability and construction documents require review by the responsible project engineer.

One project brief, connected to the next technical decision.

01 · DEFINE

Start with the system

Choose the operating context before selecting a cabinet, protection device or isolated product family.

02 · CONNECT

Continue into Solar Tools

Use string, cable, protection, hybrid and BOM tools when the corresponding electrical inputs are available.

03 · HAND OFF

Keep the review package

Save the preliminary scope locally, export the review summary and send the confirmed requirement to NEUTRON.