Use standards as project review inputs.

Keep jurisdiction, documentation and responsible-engineer confirmation visible.

Live calculation · retained project context · engineer review

Standards are inputs to the review—not automatic proof.

Solar Tools makes technical assumptions visible. The applicable edition, jurisdiction, product evidence and final project design remain subject to the responsible engineer and destination-market requirements.

Review areaCommon referenceWhat must still be confirmed
PV string configurationIEC 62548 / local PV installation rulesModule/inverter limits, string voltage, overcurrent protection, isolation and installation design.
PV DC surge protectionIEC 61643-31 / lightning-risk designSPD type, Ucpv, discharge capability, conductor routing and earthing arrangement.
PV cable routeIEC 60364-5-52 / local wiring rulesInstallation method, ambient and grouping correction, insulation class, voltage drop and termination.
Switchgear and assembliesIEC 61439 series / destination-market requirementsAssembly verification, temperature rise, short-circuit duty, internal separation and documents.
Important: A calculated pass is not a compliance certificate. Confirm the current standard edition, local authority requirements, product documentation and project-specific engineering before release.
Request engineering review