PV complete-set equipment

Prefabricated PV Step-up Substation

Move from inverter output to the medium-voltage collection system with a coordinated enclosure, interface and document review.

Prefabricated PV step-up substation beside a solar PV field

Purchase readiness

Move from product interest to a review-ready request.

Pricing is confirmed per configuration and quotation. Project builds are engineered to spec; final ratings, documents and delivery are confirmed before quotation.

MOQ
1 unit
FOB
Ningbo / Shanghai
Standard lead time
3-5 days
Project lead time
5-30 days
Sample route
3-5 days
Get a configuration quote Prefabricated PV Step-up Substation
System inputArray, inverter or electrical drawing
ConfigurationScope checked before quotation
Document basisDrawing, BOM and required records
Project reviewTechnical details aligned before release
Prefabricated PV step-up substation beside a solar PV field

Review point 01

Multiple suppliers leave the transformer and switchgear interfaces unclear.

Review the inverter output, transformer duty, HV/LV arrangement and cable interfaces as one configured package.

  • Electrical design and interfaces
  • Installation and enclosure conditions
  • Document package before release
Prefabricated substation interior with organized busbars and control wiring

Review point 02

Outdoor installation creates enclosure, access and thermal questions.

Confirm enclosure construction, environmental conditions, ventilation, service clearance and cable entry before release.

  • Electrical design and interfaces
  • Installation and enclosure conditions
  • Document package before release
Solar, substation and battery infrastructure viewed as one coordinated system

Review point 03

A quotation is not enough for the installation team.

Agree the drawing, BOM, interface details and inspection/document list that will accompany the project.

  • Electrical design and interfaces
  • Installation and enclosure conditions
  • Document package before release

Product range

Start with the family that matches the system requirement.

Model, rating and component choices are confirmed from approved project inputs.

01

Oil-immersed package

ONAN transformer arrangement for project-defined PV step-up duty

Confirm cooling, protection and site conditions

02

Dry-type package

AN/AF transformer arrangement where the installation context requires it

Confirm ventilation and enclosure layout

03

Pad-mounted compact package

Space-efficient outdoor enclosure with defined HV/LV access

Confirm foundation and cable route

04

Smart monitoring package

Optional temperature, door, gas and communication interfaces

Confirm protocol and monitoring ownership

Technical scope

Specifications structured for a project review.

Typical capacity range1000 / 1600 / 2000 / 2500 kVA starting points
LV / HV side0.4 / 0.69 / 0.8 kV to 10 / 35 kV starting points
Transformer and MV unitOil-immersed or dry-type; RMU or VCB interface as required
EnclosureOutdoor enclosure, cable entry, ventilation and service access defined by site conditions
MonitoringOptional temperature, door, gas and RS485 / Ethernet / 4G interfaces
Reference standardsIEC 60076 / IEC 62271-200 / IEC 61439 / GB/T 17467
Release packageGA, SLD, BOM, wiring/interface and inspection records as required
Grey prefabricated substation enclosure in a clean product view

Applications

Make the product conversation fit the operating context.

Utility-scale solar

EPC, IPP and power project teams

PV inverter output to medium-voltage collection interface

Commercial rooftop PV

Industrial site owners and integrators

Compact package around site footprint and cable entry

PV-plus-storage

Renewable project developers

Coordinated transformer, distribution and monitoring interfaces

System position

Keep the handoff clear from solar generation to the grid.

01PV array and inverter
02LV output review
03Step-up substation
04MV collection / grid

The exact equipment boundary, interfaces and protection responsibility are confirmed against the approved single-line diagram.

Application profiles

One product family, reviewed around the installation context.

The photographs show the operating context used in a technical discussion. Project-specific equipment, site evidence and final configuration are confirmed in the quotation package.

Prefabricated substation positioned beside a utility solar array

Application profile

Utility-scale solar

Review voltage, footprint, cable entry, access and document requirements for this context.

Substation internal arrangement prepared for interface review

Application profile

C&I and rooftop packages

Review voltage, footprint, cable entry, access and document requirements for this context.

Solar, substation and energy-storage infrastructure coordination

Application profile

PV-plus-storage systems

Review voltage, footprint, cable entry, access and document requirements for this context.

FAQ

Questions buyers usually ask before sending an RFQ.

What capacity can the prefabricated substation support?

The planning range starts at 1000, 1600, 2000 and 2500 kVA. Final capacity, transformer duty and protection arrangement are confirmed from the inverter output, site conditions and project documents.

Can the low-voltage and high-voltage sides be customized?

Yes. The starting points are 0.4 / 0.69 / 0.8 kV on the LV side and 10 / 35 kV on the HV side; the final interface follows the approved project design.

Can oil-immersed and dry-type transformers both be considered?

Both can be reviewed. The choice depends on installation environment, cooling, access, fire strategy, maintenance and the approved project specification.

What should be sent for an initial review?

The inverter output, target capacity, HV/LV voltage, single-line diagram, installation environment, quantity, destination and document requirements provide the best starting point.

Can the configuration be adapted to our project drawing?

Yes. The product-family page is a starting point. Final enclosure arrangement, component selection, interfaces and documentation are confirmed against the approved drawing, load schedule or technical brief.

What should we send for a useful first quotation?

A single-line diagram, target ratings, quantity, installation environment, delivery destination and any required standards or document list will help the engineering review start with the right assumptions.

Can NEUTRON support OEM or project-specific assembly?

The review can include OEM, drawing-led assembly and project-specific integration requirements. Scope, interfaces, inspection points and document ownership are agreed before release.

Are the figures on this page a final product datasheet?

No. This page explains the product family and the information needed for selection. The approved datasheet, drawing and quotation are the controlling documents for a specific project.

Next step

Share the requirement, not just the product name.

Application, destination, quantity, target ratings and document requirements make it easier to prepare a relevant response.